One general site record for the whole job, and one book per trade
where the columns have to be different.
AVAILABLE SHORTLY
Construction Daily Log Book
The log book that outlasts the job.
Hardcover, 280 working days, one page per day. Delay attribution named and totalled, verbal instructions with the email that confirmed them, what did not happen but should have, and the work photographed before it was covered.
300 pages · 8.25 × 11 in · hardcover · 280 days
On Amazon shortly. The listing is in review. The refill sheets above are the same pages, free to print in the meantime.
AVAILABLE
Concrete Pour Log Book
One book, 55 pours.
Ready-mix tickets, slump, air, temperature and cylinders per truck. Placement, consolidation and curing. Delay attribution, verbal instructions, and the work that was about to be covered.
120 pages · 8.5 × 11 in · 55 pour records
View on Amazon
AVAILABLE
Livret d'Équipement Frigorifique
One booklet per appliance, as the law requires.
French edition, for the operator who holds refrigeration or air conditioning equipment. Article 7 of Regulation (EU) 2024/573 requires records for each appliance, not one folder for the site. Nameplate, leak check schedule, 62 intervention records with a place to staple the technician's form, running totals of refrigerant and cost, and a replacement decision page for 2032.
80 pages · 8.5 × 11 in · French · 62 interventions
View on Amazon
AVAILABLE SHORTLY
Registre Fluides Frigorigènes
The register that writes your annual return.
French edition, for the certified company. The intervention form goes to the client; the annual refrigerant return goes to the certifying body before 31 January. It is built one intervention at a time, not in an evening in January. 100 intervention records and eight summary registers, including the annual return with the seven columns the authorities ask for.
120 pages · 8.5 × 11 in · French · 100 interventions
On Amazon shortly. The listing is in review. The refill sheets above are the same pages, free to print in the meantime.
AVAILABLE SHORTLY
F-Gase Nachweisbuch
The deadlines are already set.
German edition, for the refrigeration contractor. From 1 January 2032, servicing fixed equipment with a refrigerant at or above 750 GWP is banned: a leak becomes a replacement, not a repair. 100 intervention records, leak check intervals by CO₂ equivalent, refrigerant balance, recovery and decommissioning registers. Article 7 requires the intervening company to keep a copy for five years.
120 pages · 8.5 × 11 in · German · 100 Eingriffe
On Amazon shortly. The listing is in review. The refill sheets above are the same pages, free to print in the meantime.
IN PREPARATION
Excavation, Plumbing, Electrical and more
The same record, with the fields each trade actually needs.
Tallystick Trade Logs